Statfjord north flank on stream
The north flank of Statfjord was brought into production on 1 August 1999, after operator Statoil had chartered the Transocean Leader rig to drill and complete the required subsea wells.
![](https://i1.wp.com/statfjord.industriminne.no/wp-content/uploads/sites/4/2020/01/1989-12-PUD-Statfjord-Nord-1.jpg?resize=2000%2C1200&ssl=1)
This formation is not actually a satellite field, but part of the Statfjord reservoir. However, the reserves lie in a separate structure which could best be reached from a seabed template. This is tied back to Statfjord C.
Source:
Statoil. New Statfjord rig,
More about history
close
Close