Well A33 was the first producer to be readied. It was opened at 21.30 on Sunday 20 October 1979, and first oil reached the topside exactly at midnight.
A volume corresponding to 7 000 barrels per day was produced through a 32/64-inch choke. No sand came up from the well, which was good news.