Sygna on stream
The Sygna satellite began production on 1 August 2000. Its subsea installation was tied back by a multiphase pipeline to Statfjord C for oil processing, stabilisation, storage and export.
![](https://i2.wp.com/statfjord.industriminne.no/wp-content/uploads/sites/4/2020/01/Sygna-feltplan-fra-KU-Sygna.jpg?resize=2000%2C1200&ssl=1)
Associated gas from the field was mixed with Statfjord output for processing before being injected and/or exported via the Statpipe and Northern Leg Gas Pipeline transport systems. The development solution included a four-slot seabed template and two production wells. A new pipeline was laid to Statfjord C, with an existing line to Statfjord North used for injection water.
Sources:
Equinor. Plan for development and operation of Sygna.
Norwegian Petroleum Directorate,